找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
热搜: 活动 交友 discuz
楼主: admin
打印 上一主题 下一主题

【仕尊SPA养生会所 】

  [复制链接]

0

主题

0

好友

4

积分
级别
1 新手上路
楼主
发表于 2016-6-13 14:06:32 | 显示全部楼层

Fire engineering construction contract

sixth project quality and acceptance criteria ,new balance outlet
2. in the construction process,nike tn pas cher, in violation of the related safety operation rules or fire regulations B causes lead to the occurrence of quality accidents, safety and fire accident, Party B shall assume full responsibility and all the losses arising therefrom.
start date: _________
1. Party B shall, in compliance with the relevant national and local standards and requirements of the present state, also must carry out the Party A's "construction project safety and management measures".
< p > basis "of the people's Republic of China Contract Law,goyard soldes," "the people's Republic of China Construction Law" the relevant provisions, combined with the specific circumstances of the project, the two sides in line with the principle of friendly, honest, voluntary, negotiated by Party A and Party B agree, have agreed as follows: < p
3. in the free warranty period, Party B should be responsible for the project warranty work,woolrich sito ufficiale, regular communication with the party reached 2 times   month >
payment method: _________
second contracting scope:
project cost: _________
eighth quality warranty
Party B
seventh safety construction
fifth project cost, payment methods and the price adjustment
first project overview
third contracting methods: _________
price adjustment: _________
completion date (the project has been approved by the fire department, and issued a fire inspection certificate of time): _________
2. engineering site: _________
2. quality of the project must comply with the "building construction quality acceptance standard" gb50300-XX. "automatic fire alarm system code for construction and acceptance of" gb50166-1992. the automatic water spraying fire extinguishing system code for construction and acceptance of "(XX years Edition) gb50261-1996. the mechanical equipment installation engineering code for construction and acceptance of" gb50231-1998. "building electrical engineering code for acceptance of construction quality of" gb50303-XX. the indoor fire hydrant extinguishing system installation engineering construction standards,hogan outlet, "j512-XX. and his country and industry current relevant standards and codes.
1. the project by the two sides and the Government Fire Department to the construction drawings, design specifications, design changes and national (industry) standards,sneakers golden goose, norms for the common acceptance.
1. project name: _________
Fire engineering construction contract
fire engineering construction contract
1. the project free warranty period for _________ years,air max pas cher, lifelong maintenance.
2,hogan outlet. Party B shall arrive at the scene within 4 hours after receiving the notice of Party A's maintenance and deal with it in time.
fourth contract duration Related Articles:

  
   County man
  
   The emerge
  
   The third
  

   Two is to learn the breadth and depth of the lack of. In the study, see "fast food" newspapers and books are more, look at the political theory of books are less; read news news categories of books more, see the natural protection, forestry science and technology books less. The depth and breadth of the theory of learning is not enough to grasp the mind and soul.
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则





-->
关于我们|网站地图|帮助中心|商务合作|法律声明|诚聘英才|联系我们|
Copyright © 2010-2012 南京夜网论坛 (www.ddfyw.com)  版权所有
官方QQ:2030314199  邮箱:2030314199@qq.com

快速回复 返回顶部 返回列表